RAE Engineering
RAE Engineering and Inspection Ltd.
Mechanical Engineering
RAE Engineering

Pipelines Risk Assessment


The requirement for Risk Assessment is established by - CSA Z662 Annex N (N.5.2 or N.10)

  • Hazard identification (What can go wrong?)

Risk Analysis

  • Probability (How likely is it?)
  • Consequences (What are the consequences if it does go wrong?)
  • Safety
  • Environment
  • Cost

Risk Evaluation

  • Is the risk significant?

Risk Response

  • What can be done to eliminate the hazard or reduce the probability or consequence?